<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Jex Plant</title>
	<atom:link href="http://www.jexplantukltd.co.uk/feed" rel="self" type="application/rss+xml" />
	<link>http://www.jexplantukltd.co.uk</link>
	<description>The Alternative Dredging Company</description>
	<lastBuildDate>Tue, 05 Jun 2012 14:02:14 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.5.1</generator>
		<item>
		<title>Fly Ash Lagoon Clearance</title>
		<link>http://www.jexplantukltd.co.uk/fly-ash-lagoon-clearnce</link>
		<comments>http://www.jexplantukltd.co.uk/fly-ash-lagoon-clearnce#comments</comments>
		<pubDate>Tue, 08 May 2012 13:24:25 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Fly Ash Lagoons]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=590</guid>
		<description><![CDATA[&#160;
Traditionally Power Station Fly Ash Lagoons are emptied using excavation or dredging to recycle the waste fly ash.  This process is slow, and potentially very damaging to the environment, with spillage from the bulk haulage lorries and the transfer of the materials via the pickup on vehicle tyres, a real danger, and because of the [...]]]></description>
				<content:encoded><![CDATA[<p>&nbsp;</p>
<p>Traditionally Power Station Fly Ash Lagoons are emptied using excavation or dredging to recycle the waste fly ash.  This process is slow, and potentially very damaging to the environment, with spillage from the bulk haulage lorries and the transfer of the materials via the pickup on vehicle tyres, a real danger, and because of the amount of water in the material flocculents are needed.</p>
<p>&nbsp;</p>
<p>At Jex Plant, we can use our unique technology to pump fly ash from lagoons into either a filter press or silt bags in order to dewater it. And, as our pumping system can pump upto 70% solids, the dewatering time required is significantly reduced, filter presses become up to 60% more efficient and the fly ash can be recycled extremely quickly.</p>
<p>&nbsp;</p>
<p>Our system does not require a large amount of plant, therefore reducing the amount of onsite traffic.</p>
<p>&nbsp;</p>
<p>Using this brand new system, flocculent is not required. Our system is very flexible &#8211; we can remove fly ash via pontoons for larger lagoons or from the edge for smaller lagoons.</p>
<p>&nbsp;</p>
<p>Our system is suitable for use in plastic lined, membrane lined or clay lined fly ash lagoons.</p>
<p>&nbsp;</p>
<p>We can also pump dry fly ash!</p>
<h3></h3>
<h3><strong><span style="color: #ffcc00;">To find out more about our Power Station Fly Ash Lagoon clearance service, please call Peter on 0845 6890007.</span></strong></h3>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/fly-ash-lagoon-clearnce/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Farm Slurry Lagoon Emptying</title>
		<link>http://www.jexplantukltd.co.uk/slurry-lagoon</link>
		<comments>http://www.jexplantukltd.co.uk/slurry-lagoon#comments</comments>
		<pubDate>Fri, 06 Apr 2012 10:32:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Slurry]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=572</guid>
		<description><![CDATA[As you know, traditionally farm slurry lagoons are emptied by first stirring the slurry, and then extracting it to slurry tankers ready for spreading on the land.
&#160;
There are three  main problems with this;
&#160;
1) It is time consuming
2) Not all the slurry can be removed from the lagoon without damaging it&#8217;s liner
3) Additional water is required
&#160;
Using [...]]]></description>
				<content:encoded><![CDATA[<p>As you know, traditionally farm slurry lagoons are emptied by first stirring the slurry, and then extracting it to slurry tankers ready for spreading on the land.</p>
<p>&nbsp;</p>
<p>There are three  main problems with this;</p>
<p>&nbsp;</p>
<p>1) It is time consuming</p>
<p>2) Not all the slurry can be removed from the lagoon without damaging it&#8217;s liner</p>
<p>3) Additional water is required</p>
<p>&nbsp;</p>
<p>Using our pumping system, we can drain your slurry lagoon right down to the liner without damaging it, without the need for stirring and because we can move 80% solid material using compressed air, very little (if any) additional water is required, and in these times of drought, that&#8217;s a massive bonus!</p>
<p>&nbsp;</p>
<p><span style="color: #ffcc00;"><strong>To restore your slurry lagoon back to full capacity, call Peter on 0845 6890007 or 07768 234336</strong></span></p>
<p>&nbsp;</p>
<p><a href="http://www.jexplantukltd.co.uk/membrane-clay-lined-reservoir-desilting/membranelinedreservoir1" rel="attachment wp-att-336"><img class="aligncenter  wp-image-336" title="Slurry Lagoon" src="http://www.jexplantukltd.co.uk/wp-content/uploads/2009/11/membranelinedreservoir1-300x225.jpg" alt="Membrane lined reservoir desilting" width="389" height="291" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/slurry-lagoon/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Broads Authority Trial</title>
		<link>http://www.jexplantukltd.co.uk/broads-authority-trial</link>
		<comments>http://www.jexplantukltd.co.uk/broads-authority-trial#comments</comments>
		<pubDate>Mon, 02 Apr 2012 12:07:19 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Testimonials]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=557</guid>
		<description><![CDATA[&#160;
We were contracted to do a trial to provide the Broads Authority with evidence of our ability to dredge from one location and use our pumping system to deposit the silt at a location several hundred yards away. Click on Read More to see a video of our pumping system at work.
&#160;

&#160;

Here&#8217;s what the Rivers [...]]]></description>
				<content:encoded><![CDATA[<p>&nbsp;</p>
<p>We were contracted to do a trial to provide the Broads Authority with evidence of our ability to dredge from one location and use our pumping system to deposit the silt at a location several hundred yards away. Click on Read More to see a video of our pumping system at work.</p>
<p>&nbsp;</p>
<p><span id="more-557"></span></p>
<p>&nbsp;</p>
<p style="text-align: center;"><iframe width="500" height="375" src="http://www.youtube.com/embed/uE3834kQ2vM?feature=oembed" frameborder="0" allowfullscreen></iframe></p>
<p>Here&#8217;s what the Rivers Engineer had to say.</p>
<p>&nbsp;</p>
<p>Dear Peter,</p>
<p>&nbsp;</p>
<p>As I said on the day, it was a successful trial and showed this system to be a potentially useful tool to the Broads Authority.</p>
<p>&nbsp;</p>
<p>Your Sincerely</p>
<p>&nbsp;</p>
<p>Mr T Hunter</p>
<p>Rivers Engineer</p>
<p><a href="http://www.jexplantukltd.co.uk/broads-authority-trial/broadsauthoritydesiltingtrial" rel="attachment wp-att-558"><img class="alignleft size-medium wp-image-558" title="Broads Authority Desilting Trial" src="http://www.jexplantukltd.co.uk/wp-content/uploads/2012/04/broadsauthoritydesiltingtrial-300x225.jpg" alt="Broads Authority Desilting Trial" width="300" height="225" /></a><a href="http://www.jexplantukltd.co.uk/broads-authority-trial/desiltingoperation" rel="attachment wp-att-559"><img class="alignright size-medium wp-image-559" title="Desilting Operation" src="http://www.jexplantukltd.co.uk/wp-content/uploads/2012/04/Desiltingoperation-300x225.jpg" alt="Desilting Operation" width="300" height="225" /></a></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/broads-authority-trial/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Moat Desilting</title>
		<link>http://www.jexplantukltd.co.uk/moat-desilting-contractor</link>
		<comments>http://www.jexplantukltd.co.uk/moat-desilting-contractor#comments</comments>
		<pubDate>Thu, 29 Mar 2012 09:37:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Moat Desilting]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=547</guid>
		<description><![CDATA[
Watch as we desilt a moat. This particular moat has a huge amount of silt and very little water, but using or moat desilting techniques, we brought the moat back to life.
]]></description>
				<content:encoded><![CDATA[<p style="text-align: center;"><iframe width="460" height="259" src="http://www.youtube.com/embed/TNCPy97jJqY?fs=1&#038;feature=oembed" frameborder="0" allowfullscreen></iframe></p>
<p style="text-align: left;">Watch as we desilt a moat. This particular moat has a huge amount of silt and very little water, but using or moat desilting techniques, we brought the moat back to life.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/moat-desilting-contractor/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>River and Canal Dredging Contractor</title>
		<link>http://www.jexplantukltd.co.uk/river-and-canal-dredging-contractor</link>
		<comments>http://www.jexplantukltd.co.uk/river-and-canal-dredging-contractor#comments</comments>
		<pubDate>Tue, 27 Mar 2012 15:13:34 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[River and Canal Dredging]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=525</guid>
		<description><![CDATA[
&#160;
As a leading river and canal dredging contractor, we can use one of a number of different dredging techniques, to dredge rivers and canals. As you can see in the above video we can dredge rivers and canals, removing the silt via a barge to an offsite area, and using or unique pumping system, empty [...]]]></description>
				<content:encoded><![CDATA[<p style="text-align: center;"><iframe width="453" height="340" src="http://www.youtube.com/embed/XzqZambPp_g?fs=1&#038;feature=oembed" frameborder="0" allowfullscreen></iframe></p>
<p>&nbsp;</p>
<p>As a leading river and canal dredging contractor, we can use one of a number of different dredging techniques, to dredge rivers and canals. As you can see in the above video we can dredge rivers and canals, removing the silt via a barge to an offsite area, and using or unique pumping system, empty the barge contents to nearby farmland or other areas offsite.</p>
<p>&nbsp;</p>
<p>In certain circumstances we can also pump silt directly from a pontoon to the holding area. Call Peter on 0845 6890007 or 07768 234336 to discuss your river or canal dredging needs.</p>
<p>&nbsp;</p>
<p style="text-align: left;"><a href="http://www.jexplantukltd.co.uk/wp-content/uploads/2012/03/Image004.jpg"><img class="alignleft size-medium wp-image-532" title="Image004" src="http://www.jexplantukltd.co.uk/wp-content/uploads/2012/03/Image004-300x225.jpg" alt="" width="300" height="225" /></a><a href="http://www.jexplantukltd.co.uk/wp-content/uploads/2012/03/Image012.jpg"><img class="alignright size-medium wp-image-531" title="Image012" src="http://www.jexplantukltd.co.uk/wp-content/uploads/2012/03/Image012-300x225.jpg" alt="" width="300" height="225" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/river-and-canal-dredging-contractor/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Desilting Testimonials</title>
		<link>http://www.jexplantukltd.co.uk/desilting-testimonials</link>
		<comments>http://www.jexplantukltd.co.uk/desilting-testimonials#comments</comments>
		<pubDate>Fri, 17 Feb 2012 13:53:47 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Quarry Settlement Lagoons]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=518</guid>
		<description><![CDATA[
Broads Authority Trial
&#160;
We were contracted to do a trial to provide the Broads Authority with evidence of our ability to dredge from one location and use our pumping system to deposit the silt at a location several hundred yards away. Click on Read More to see a video of our pumping system at work.  Watch [...]]]></description>
				<content:encoded><![CDATA[<h3></h3>
<h2><a title="Broads Authority Trial" href="../broads-authority-trial" rel="bookmark">Broads Authority Trial</a></h2>
<p>&nbsp;</p>
<p>We were contracted to do a trial to provide the Broads Authority with evidence of our ability to dredge from one location and use our pumping system to deposit the silt at a location several hundred yards away. Click on Read More to see a video of our pumping system at work.  <a href="../broads-authority-trial#more-557">Watch the video </a></p>
<p>&nbsp;</p>
<h3>Moat Desilting</h3>
<p>Having watched the silt get deeper and deeper in our moat over a period of about 20 years I finally contacted Peter Jex in 2011. Peter came out and gave us some prliminary ideas and suggestions. I was attracted by his proposal to pump the silt from the moat and spread it evenly in a nearby wood. [<a title="Moat Desilting Testimonial" href="http://www.jexplantukltd.co.uk/moat-desilting-testimonial">Read More</a>]</p>
<h3></h3>
<h3>Sibelco slurry lagoon clearence</h3>
<p>As a large Industrial Minerals company we create solids as a by product of sand washing. The solids generated from our process settles into lagoons which from time to time, require cleaning out.<br />
Previously Sibelco has used long reach machines which can be very messy as slurries have high water content and low solids.<br />
Four years ago Jex Plant was working at our Kings Lynn site and he indicated that he could pump out our lagoons using a novel system he had developed. [<a title="Sibelco slurry lagoon clearence" href="http://www.jexplantukltd.co.uk/sibelco">Read more</a>]</p>
<p>&nbsp;</p>
<h3>King&#8217;s Lynn Golf Club</h3>
<p>Jex Plant were chosen from a number of companies who had quoted to carry out ground work to extend and deepen our irrigation pond.<br />
They were very mindful of our operations and at no time impeded our work programmes. Their staff were polite and hard working. All work was carried out to our specifications and to a very high standard. [<a title="King’s Lynn Golf Club" href="http://www.jexplantukltd.co.uk/kings-lynn-golf-club">Read more</a>]</p>
<p>&nbsp;</p>
<h3>Crawley Mariners Yatch Club</h3>
<p>I am pleased to be able to say that we are most satisfied with the way the work was carried out &#8211; the team worked well with us to ensure that it went smoothly overall. The final cost gave good value when compared to other quotes we had received. We were particularly pleased that your method of removal did result in all of the material being accommodated in the area that we had available. [<a title="Crawley Mariners Yatch Club" href="http://www.jexplantukltd.co.uk/crawley-mariners-yatch-club">Read more</a>]</p>
<p>&nbsp;</p>
<h3>Moat Desilting</h3>
<p>We have recently used this team to clear, pump out and de-silt a moat/watercourse round our property. The location and immediate environment presented difficulties of access for heavy machinery (eg JCB) and silt pumping seemed to afford the least damaging option .</p>
<p>They first came with equipment and an inflatable and made a comprehensive survey on which they based charges. [<a title="Moat Desilting" href="http://www.jexplantukltd.co.uk/moat-desilting">Read more</a>]</p>
<p>&nbsp;</p>
<h3>Chobham Pond Desilting</h3>
<p>Now the work on our pond is successfully completed, we wanted to thank you properly for your help.    You have transformed an ugly sludge-filled, mosquito ridden eyesore into a water feature which, once it is planted up, will be a real asset to our gardens.    Already we can see the difference you have made to the outlook from the house over the pond and the weir. [<a title="Chobham Pond Desilting" href="http://www.jexplantukltd.co.uk/chobham-pond-desilting">Read more</a>]</p>
<p>&nbsp;</p>
<h3>Scarning Pond Desilting</h3>
<p>We would like to thank you and your team of enthusiastic of men who battled on despite the horrendous weather at the end of January. We are very pleased with the result and  the way it was executed are looking forward to seeing it full of clear, weed free water. [<a title="Scarning Pond Desilting" href="http://www.jexplantukltd.co.uk/scarning-pond-desilting">Read more</a>]</p>
<p>&nbsp;</p>
<h3>Aggregate Industustries Mepal Quarry</h3>
<p>Historically speaking, movement of silt from the lagoons would normally be carried out by way of load and haul practices. Moblie plant requiremnets for such an operation are Excavator and three articulated dumpers. Using load and haul techniques for silt movement has in the past raised cost, environmental and safety issues and as such a new approach was sought. [<a title="Aggregate Industustries Mepal Quarry" href="http://www.jexplantukltd.co.uk/aggregate-industustries-mepal-quarry">Read more</a>]</p>
<h3><span style="color: #ffcc00;"> Call 0845 689 0007 or 07768 234336 to discuss your silt pumping needs.</span></h3>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/desilting-testimonials/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Moat Desilting Testimonial</title>
		<link>http://www.jexplantukltd.co.uk/moat-desilting-testimonial</link>
		<comments>http://www.jexplantukltd.co.uk/moat-desilting-testimonial#comments</comments>
		<pubDate>Fri, 17 Feb 2012 13:52:35 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Testimonials]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=521</guid>
		<description><![CDATA[Having watched the silt get deeper and deeper in our moat over a period of about 20 years I finally contacted Peter Jex in 2011. Peter came out and gave us some prliminary ideas and suggestions. I was attracted by his proposal to pump the silt from the moat and spread it evenly in a [...]]]></description>
				<content:encoded><![CDATA[<p>Having watched the silt get deeper and deeper in our moat over a period of about 20 years I finally contacted Peter Jex in 2011. Peter came out and gave us some prliminary ideas and suggestions. I was attracted by his proposal to pump the silt from the moat and spread it evenly in a nearby wood.</p>
<p>After coming back for a full survey, Peter gave usa detailed quote broken down into seperate ares in case we wanted to do part only.</p>
<p>We agreed to go ahead with the full job and were given an estimated start date and an estimated duration for the job. The job started on time and was completed just a few days over the stimated period.</p>
<p>Unfortunately we suffered from an exceptionally dry autumn and there was insufficient water to enable the silt to be pumped. As a result dumper trucks had to be brought in to transport the silt away. The job was still completed in a professional and timely manner. The only downside was the silt which we expected to be spread evenly (and thinly) had to be left in large piles which we plan to level out next year.</p>
<p>Overall we are very satisfied with the standard of work and the manner in which the site was cleared at the end of the job.</p>
<p>Peter Garner</p>
<p>November 2011</p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/moat-desilting-testimonial/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Pond Desilting Video Testimonial</title>
		<link>http://www.jexplantukltd.co.uk/pond-desilting-video-testimonial</link>
		<comments>http://www.jexplantukltd.co.uk/pond-desilting-video-testimonial#comments</comments>
		<pubDate>Thu, 12 May 2011 19:23:37 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Testimonials]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=462</guid>
		<description><![CDATA[Here is a short video testimonial from one of our recent customers. The client did not want to appear on the video but was happy to talk.
&#160;

]]></description>
				<content:encoded><![CDATA[<p>Here is a short video testimonial from one of our recent customers. The client did not want to appear on the video but was happy to talk.</p>
<p>&nbsp;</p>
<p style="text-align: center;"><strong><br /><img src="http://www.jexplantukltd.co.uk/wp-content/uploads/2011/05/desiltingtestimonial.jpg" alt="media" /><br />
</strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/pond-desilting-video-testimonial/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
	<enclosure url="http://www.jexplantukltd.co.uk/wp-content/uploads/2011/05/lakedesiltingtestimonial.flv" length="1" type="video/x-flv"/>
	</item>
		<item>
		<title>Sibelco slurry lagoon clearence</title>
		<link>http://www.jexplantukltd.co.uk/sibelco</link>
		<comments>http://www.jexplantukltd.co.uk/sibelco#comments</comments>
		<pubDate>Fri, 25 Mar 2011 12:53:52 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Testimonials]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=457</guid>
		<description><![CDATA[As a large Industrial Minerals company we create solids as a by product of sand washing. The solids generated from our process settles into lagoons which from time to time, require cleaning out.
Previously Sibelco has used long reach machines which can be very messy as slurries have high water content and low solids.
Four years ago [...]]]></description>
				<content:encoded><![CDATA[<p><a href="http://www.jexplantukltd.co.uk/wp-content/uploads/2011/03/sibelco.jpg"><img class="size-full wp-image-459 alignleft" style="border: 0pt none; margin: 10px;" title="sibelco" src="http://www.jexplantukltd.co.uk/wp-content/uploads/2011/03/sibelco.jpg" alt="Lagoon Desilting Testimonial" width="273" height="87" /></a>As a large Industrial Minerals company we create solids as a by product of sand washing. The solids generated from our process settles into lagoons which from time to time, require cleaning out.<br />
Previously Sibelco has used long reach machines which can be very messy as slurries have high water content and low solids.<br />
Four years ago Jex Plant was working at our Kings Lynn site and he indicated that he could pump out our lagoons using a novel system he had developed.<br />
In the first year of pumping it was evident that the system was a success, the method moved larger volumes of solids in a shorter period of time, it reduced vehicle movements and when the job was complete there was very little spillage which was great for the environment.<br />
Sibelco have used Jex Plant over the last four years and are satisfied with their safety and work ethics and their knowledge of their pumping system and are happy to continue using them as and when needed in the future.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/sibelco/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>King&#8217;s Lynn Golf Club</title>
		<link>http://www.jexplantukltd.co.uk/kings-lynn-golf-club</link>
		<comments>http://www.jexplantukltd.co.uk/kings-lynn-golf-club#comments</comments>
		<pubDate>Fri, 18 Mar 2011 14:44:19 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Testimonials]]></category>

		<guid isPermaLink="false">http://www.jexplantukltd.co.uk/?p=427</guid>
		<description><![CDATA[Jex Plant were chosen from a number of companies who had quoted to carry out ground work to extend and deepen our irrigation pond.
They were very mindful of our operations and at no time impeded our work programmes. Their staff were polite and hard working. All work was carried out to our specifications and to [...]]]></description>
				<content:encoded><![CDATA[<p>Jex Plant were chosen from a number of companies who had quoted to carry out ground work to extend and deepen our irrigation pond.<br />
They were very mindful of our operations and at no time impeded our work programmes. Their staff were polite and hard working. All work was carried out to our specifications and to a very high standard.<br />
The site manager kept the Club up to date with progress and checked thatwe were happy with proceedings.<br />
Once excavations had finished their staff reinstated our track and left the side very tidy.<br />
I would have no hesitation in recommending Jex Plant for any soil excavation works.</p>
<p>Colin Robinson<br />
Course Manager</p>
]]></content:encoded>
			<wfw:commentRss>http://www.jexplantukltd.co.uk/kings-lynn-golf-club/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
